Renting a machine takes about a month. It should take two days.
One request goes out to every qualified supplier, the offers come back in the same shape, and the rates are published before you ask for one.
- 10,000+contractors on Moedatech
- 70,000+machines on the network
- 13,820+supplier quotes behind the published rates
The same job, two ways
This is not a complaint about suppliers. It is what the phone forces on both sides.
What a machine actually costs
Three rows straight off the rate pages. Saudi riyals, excluding VAT, from supplier quotes between April and August 2026.
| Machine | Per day | Per month | Range of quotes |
|---|---|---|---|
Crawler excavator20 t | 725 | 18,000 | 16,000 - 20,000 |
Telehandler17 m | 900 | 15,500 | 15,000 - 16,000 |
Forklift10 t | 825 | 14,500 | 13,000 - 16,000 |
Every machine class and size is on the rental rates pages, with what moves the price and why some rows carry no figure.
Who is on the network
Rental companies with a public store, the machines they hold out, and where they are.
Every company on Moedatech keeps a public store: the machines it holds out, their sizes and its city. Verification is done before a supplier can quote, so what you are reading is a checked company, not a listing.
Most of the fleet sits in Riyadh. Jeddah, Dammam, Jubail, Khobar, Dhahran, Qatif, Al Ahsa, Medina, Yanbu, Tabuk and Jazan are all represented, and the whole directory is open to read without an account.
Short answers
What does it cost a contractor?
The app is free to download and asks for no card. What the rental costs is the supplier’s own price, and you see it in the offer before you accept it.
Does Moedatech own the machines?
No. Moedatech holds no fleet. Every machine belongs to the supplier who lists it, and the rental is between you and that company.
What if only one supplier answers?
If a request gets fewer than three responses, the team goes after suppliers in your area directly rather than leaving you waiting.
Where do the published rates come from?
From 13,820+ supplier quotes given on the platform between April and August 2026 - not from a price list. The method, including where the data is too thin to publish a figure, is written out on the rates pages.
Describe the job once and let the offers come to you.
Request free quotes

